Technical Performance Analysis (TPA) has wide range of application in project management, especially during pre-construction stages and post construction stages. During the pre-construction stages, the technical feasibility of achieving desired levels of performance of parameters like;
- Earthquake resistance
- Stress resistance
- Water proofing
- Heating
- Power consumption
- Mean Time Between Failure (MTBF) etc are checked through formal technical performance analysis of simulation models.
Building Information Modelling (BIM) aids in a big way to perform TPA before the real construction. Post construction, Technical Performance Analysis of the actual deliverables are done against pre-defined criteria (Acceptance tests).